Oracle Primavera Unifier corre em iOS.
Licença: | Freeware |
Data de adição: | 12/05/2024 |
Editor: | Oracle America, Inc. |
Alterar o Registro: |
• Ability to refresh the business process(s) when changes are made to setup, design and configuration at server side. • Technical improvements and bug fixes. |