Oracle Primavera Unifier loopt op iOS.
Licentie: | Freeware |
Datum toegevoegd: | 12-05-2024 |
Uitgever: | Oracle America, Inc. |
Log wijzigingen: |
• Ability to refresh the business process(s) when changes are made to setup, design and configuration at server side. • Technical improvements and bug fixes. |