Oracle Primavera Unifier iOS 실행됩니다.
라이센스 : | 프리웨어 |
날자 : | 2024-05-12 |
제작사 : | Oracle America, Inc. |
로그인 변경 |
• Ability to refresh the business process(s) when changes are made to setup, design and configuration at server side. • Technical improvements and bug fixes. |