Oracle Primavera Unifier läuft unter iOS.
Lizenz: | Freeware |
Datum: | 12.05.2024 |
Hersteller: | Oracle America, Inc. |
Änderungen: |
• Ability to refresh the business process(s) when changes are made to setup, design and configuration at server side. • Technical improvements and bug fixes. |